Sale!

Gray Front Open Shirt – Plum Embroidered Cigarette Pants

$ 926

Article Full Sleeves Short Shirt is artistically coordinated with Cigarette Pants and comes with dupatta.
Event
Hand EmbroideryGolden Embroidery, Silver & Golden Embroidery,
Other Styles Front Open, Plus Size,
Colours Gray, Plum,
Fabrics Raw Silk,
NecklineSimple Design
SleevesFull Sleeves,
Dress Code 13970

Top:

  • Color: Gray
  • Fabric: Raw silk / Organza
  • Front open short shirt.
  • The shirt has been adorned with embroidered neckline.
  • Applique work border implemented on the hemline.
  • The gown features marvelous embellishments accent all over the front.
  • Full sleeves
  • Embroidered Sleeves
  • Concealed with back zip closure.
  • Lining inside.

Bottom:

  • Color: Plum
  • Fabric: Raw silk
  • Capri pants
  • Embroidered border implemented at the bottom
  • Finished edges.

Dupatta :

  • Color: Gray
  • Fabric: Crinkle Chiffon
  • Dupatta contains finished edges.

Embellishment :

  • Hand made embroidery
  • Work includes kora, dabka, stones, sequins, beads, silk threads, and Swarovski crystals.
  • 100% pure highest quality imported fabric.

Consultation & Customisation

If you would like to buy this outfit please fill the below form with your requirements. Our designer will be back to you with all the information.
  1. (required)
  2. (required)
 

Make an Appointment

You can view the samples in Brantford, Ontario, Canada. Please book an appointment via WhatsApp+441212884400 or email at sales@deemasfashion.ca

Dress Care Instructions
  • Do not wash.
  • Do not bleach.
  • Do not tumble dry.
  • Iron at a maximum sole-plate temperature of 110C.
  • Mild professional dry cleaning in hydrocarbons.
  • We recommend you take special care of this garment.
Sizes Available
Made to Measure. We will make this dress according to your requirements and measurements. We can add sleeves and change the colour of any dress. We do not charge extra for PLUS SIZES.

Time Frame
Normally we take 15-35 working days for Casual and formal wear dresses (25-65 working days for heavy & bridal dresses). For urgent delivery please contact us.

Step by Step Pictures While Dress Making
We offer step by step pictures of dress making (from dying till finishing) so you can change anything you like. This facility takes extra 15 days but really suitable for heavy dresses.